Concrete Driveway Cost Calculator

Installed cost for a new concrete driveway — or a full replacement with tear-out — with the material split out.

Inputs

ft
ft
in

5 in is the residential standard. Use 6 in where trucks park.

$

Results

Estimated installed cost

$2,880 – $5,760

Area
480.00 ft²
Concrete with 10% waste
8.15 yd³
Ready-mix material
$1,304
Cost per ft²
$6 – $12

area × $6–$12/ft² installed

The installed range covers excavation, a compacted base, forming, reinforcement, placing and a broom finish. Material is shown separately so you can see the split.

Calculated with BuildCalculators.com

How to use this calculator

  1. Choose new driveway, or replacement to include tear-out of the old one.
  2. Enter length and width in feet — measure the drive, not the lot.
  3. Keep 5 in thickness for cars; use 6 in where trucks or RVs park.
  4. Read the installed range, with the concrete material shown separately.

How the calculation works

A driveway estimate is a slab estimate with three things turned up: thickness, base and edge cases. The calculator prices the finished job per square foot — the way contractors quote it — and shows the ready-mix material separately, so you can see how much of the bill is concrete and how much is everything around it.

Replacement mode adds the line new-driveway quotes conveniently omit: tearing out and disposing of the old slab before anything new happens.

  • Installed costarea × $6–$12 per ft²
  • Replacement+ area × $2–$6 per ft² tear-out
  • Concreteyd³ = ft² × (thickness ÷ 12) ÷ 27, × 1.1 waste

Why 5 inches, not 4

A patio carries feet; a driveway carries a two-ton vehicle making the same turn every day. The extra inch over a 4 inch slab raises the driveway’s load capacity by roughly half again, for about a dollar per square foot of concrete. It is the cheapest durability money in the whole job. Where pickups, RVs or delivery trucks stand, go to 6.

What the per-square-foot range includes

Excavation, 4 inches of compacted gravel base, forms, reinforcement, the concrete, placing, a broom finish and control joints. The bottom of the range is a simple rectangle with easy truck access; the top is slopes, curves, pump trucks and city labour rates. Decorative finishes sit above this range entirely — see the slab cost calculator for stamped and exposed aggregate.

Why tear-out is its own line

Breaking, loading and dumping a 5 inch reinforced slab runs $2–$6 per square foot — on a 480 ft² driveway, potentially more than a fifth of the whole project. Quotes that bury it make comparison impossible; quotes that omit it produce the classic mid-job surprise.

The base is the driveway

Concrete cracks where its support moves. Four inches of compacted gravel over well-drained subgrade is what keeps a driveway flat through winters; the concrete only bridges what the base carries. A low quote that skips or thins the base is not the same product at a better price.

Worked examples

Single-car driveway, 40 × 12 ft

New construction at 5 inches on a prepared base.

Area
40 × 12 = 480 ft²
Installed range
480 × $6–$12 = $2,880–$5,760
Concrete
480 × 0.417 ÷ 27 × 1.1 = 8.15 yd³
Material at $160/yd³
≈ $1,300

$2,880–$5,760 installed

Material is roughly a quarter to a third of the total — labour, base and forming carry the rest. That split is normal, not padding.

Double-car driveway, 40 × 20 ft

The same build, twice the width.

Area
800 ft²
Installed range
$4,800–$9,600
Concrete
13.6 yd³ with waste

$4,800–$9,600 installed

Per square foot this usually lands lower than the single — mobilisation spreads over more area. Big drives get the bottom of the range more easily.

Replacing a 40 × 12 driveway

Tear out the cracked original, pour new.

Tear-out
480 × $2–$6 = $960–$2,880
New driveway
$2,880–$5,760
Total
$3,840–$8,640

$3,840–$8,640 all-in

If the old drive failed young, find out why before pouring — a bad subgrade cracks the replacement on the same schedule.

Reference tables

Typical installed totals, 2026

5 in broom finish on a compacted base; new construction.

DrivewayAreaInstalled range
Short single, 20 × 10 ft200 ft²$1,200–$2,400
Single car, 40 × 12 ft480 ft²$2,880–$5,760
Double car, 40 × 20 ft800 ft²$4,800–$9,600
Long double, 60 × 20 ft1,200 ft²$7,200–$14,400

What moves a quote inside the range

FactorEffect
Straight, flat rectangleBottom of range
Slopes, curves, stepsUpper half
Pump truck needed+$800–$1,500 flat
6 in thickness+ roughly $1/ft²
Tear-out of old drive+$2–$6/ft²
Decorative finishLeaves this range — see slab cost

What it costs

Concrete driveways are quoted per square foot because every line of the job scales with area. The useful move is making quotes comparable: same thickness, same base, tear-out separated, reinforcement named.

Reading a driveway quote

Five numbers make two quotes comparable: thickness in inches, base depth and material, reinforcement (mesh or bar), the per-square-foot rate, and the tear-out line if replacing. A quote missing thickness or base is not low — it is incomplete.

Where not to save

Thickness and base. Dropping 5 inches to 4 saves roughly $500 on a single-car drive and shortens its life by years; skipping base compaction is invisible on day one and cracks by year three. Save instead on finish (broom is the durable default) and timing — shoulder-season pours quote cheaper than peak summer.

The joints are free insurance

Control joints at 10–12 ft spacing tell the inevitable shrinkage cracks where to happen — in the joint, invisibly. A driveway poured without a joint plan cracks anyway, wherever it likes. Ask to see the joint layout; a crew that has one is a crew that does this properly.

Curing is part of the price

Seven days before cars, and ideally a curing compound or wet cure in hot weather. Concrete that dries too fast finishes weak at the surface — the powdery, flaking driveways you have seen are usually a curing failure, not a material one.

Common mistakes

Comparing quotes with different specs

A $6/ft² quote at 4 inches with no mesh against an $8/ft² quote at 5 inches with bar is not a $2 difference — it is two different driveways. Fix the spec first, then compare the money.

Forgetting the apron and approach

The flare where the driveway meets the road, and any sidewalk crossing, are part of the area — and sometimes part of a municipal permit. Measure to the street, not to the property line, and ask who owns the apron rules.

Pouring over the old driveway

A thin topping over old concrete bonds poorly and mirrors every existing crack. Unlike asphalt, concrete has no honest overlay at driveway thickness — replacement means removal.

Driving on it early

The first week sets the driveway’s whole life. Cars at day three leave edge cracks that show up at year five. Park on the street; it is the cheapest quality control in the project.

Treating drainage as someone else’s problem

Water standing against or under a driveway is the base-killer. The pour should leave a 1–2% fall away from the garage, and downspouts should discharge clear of the slab. Drainage decisions cost little during the build and a replacement after it.

Frequently asked questions

How much does a concrete driveway cost in 2026?

Typically $6–$12 per square foot installed for a 5 inch driveway on a proper base — $2,880–$5,760 for a 40 × 12 single-car drive. Replacement adds $2–$6 per square foot for tear-out and disposal.

How thick should a concrete driveway be?

5 inches is the residential standard, over 4 inches of compacted gravel base. Go to 6 inches where pickups, RVs or delivery trucks will stand. A 4 inch driveway saves one inch of concrete and usually cracks years earlier.

Is concrete or asphalt cheaper for a driveway?

Asphalt installs cheaper — $4–$7 per square foot against $6–$12 — but needs sealing every 3–5 years and typically an overlay by year 15–20, while concrete runs 30–40 years. Over 20 years the totals converge; our asphalt vs concrete guide does the arithmetic in the open.

How long before I can drive on a new concrete driveway?

Seven days is the standard guidance for cars. Concrete reaches roughly 70% of its strength in that first week; parking on it sooner risks edge cracking that no repair fully undoes.

Related calculators

Put this calculator on your site

Embed the Concrete Driveway Cost Calculator anywhere — it is free, stays in sync with this page, and sizes itself to fit. The only condition is the credit line in the snippet, which links your readers to the full version with the formulas and worked examples.

<!-- Concrete Driveway Cost Calculator — free embed from BuildCalculators.com -->
<div data-buildcalculators="concrete-driveway-cost-calculator"></div>
<script async src="https://buildcalculators.com/embed.js"></script>
<p>Free concrete driveway cost calculator by <a href="https://buildcalculators.com/concrete-driveway-cost-calculator">BuildCalculators</a></p>

How this number was worked out

This calculator uses published constants from named industry sources, each asserted in an automated test that runs on every build. The formula is printed with the result above, and any correction we make is logged on the changelog.

It is a planning estimate. It does not replace an engineer, a site visit or a written quote — confirm quantities with your supplier before ordering.